23-S3 | Synthesis: UAV Uses for Winter Maintenance | | In Progress |
23-S2 | Synthesis: Brine-Making Practices | | In Progress |
23-S1 | Synthesis: Management of Video Recordings and Images Taken from Truck-Mounted Cameras | | In Progress |
23-02 | Quantifying the Economic Value of Snow and Ice Operations Success | | In Progress |
23-04 | Using Vegetation Management Practices Near Roads to Leverage the Benefits of Solar Radiation | | In Progress |
23-03 | Updating the Impact of Capital Projects Decision Support Tool | | In Progress |
23-01 | Development of a Public Service Announcement Library | | In Progress |
22-06 | pH Waiver for Deicing Products and the Qualified Products List | | In Progress |
22-04 | Evaluation of Direct Liquid Application of Salt Brine vs Granular Salt as Measured through Various Performance and Safety Metrics | | In Progress |
22-02 | Best Management Practices for Liquid Chloride Storage and Pumping Systems | | In Progress |
22-05 | Use of Dashboards for Winter Operations | | In Progress |
22-03 | Effects of Additives in Deicing Salts at Lower Temperatures | | In Progress |
22-01 | Comprehensive Guide to Pre-wetting Application Rates and Methods | | In Progress |
22-S1 | Corrosion and Connectors Don’t Mix | 01/2023 | Completed |
21-07 | Determining the Migration of Chloride-based Deicers through Different Soil Types | | In Progress |
21-06 | Calculating Plow Cycle Times from AVL Data | 02/2024 | Completed |
21-02 | Update to CR 13-04: Best Practices for Protecting DOT Equipment from the Corrosion Effect of Chemical Deicers | | In Progress |
21-03 | Efficacy, Cost, and Impacts of Non-Chloride Deicers | 09/2023 | Completed |
21-04 | Training Module Development for Evaluation of Storm Severity Index and Winter Severity Index Variables | 07/2024 | Completed |
21-01 | Grip Sensor Technology and Salt Applications | | In Progress |
21-05 | Evaluation of Electric Vehicle Technologies and Alternative Fuels for Winter Operations | 02/2023 | Completed |
19-01 | Expanding Application Rate Guidance for Salt Brine Blends for Direct Liquid Application and Anti-icing | 12/2021 | Completed |
20-05 | Using GIS to Highlight Highway Segments Sensitive to Deicing Materials | 03/2024 | Completed |
20-04 | Expanded Use of AVL/GPS Technology | 01/2023 | Completed |
18-04 | Review and Summary of Pre-wet Methods and Procedures | 06/2021 | Completed |
20-03 | Evaluation of Indoor Automated Stockpile Measurement Systems | 12/2022 | Completed |
20-07 | AWSSI Enhancements, Phase 2 | 08/2021 | Completed |
20-06 | Salt Shed Design Template | | In Progress |
20-02 | Understanding the NaCl Phase Diagram | 06/2022 | Completed |
18-03 | Evaluation of SSI and WSI Variables | 12/2020 | Completed |
20-01 | Entry-Level Driver Training (CDL) for Maintenance Equipment Operators | 09/2021 | Completed |
18-S1 | Mechanic/Operator Training and Training Needs for Winter Maintenance Equipment | 09/2020 | Completed |
18-01 | Defensive Driving for Snowplow Operators | 08/2020 | Completed |
18-05 | Alternative Methods for Deicing | 07/2020 | Completed |
17-02 | Standard Specifications for Plow Blades with Carbide Inserts | 04/2020 | Completed |
19-04 | Synthesis of Technical Requirements and Considerations for Automated Snowplow Route Optimization | 10/2021 | Completed |
19-03 | Measuring the Efficiencies of Tow Plows and Wing Plows | 12/2021 | Completed |
19-S2 | Resources, Practices and Needs for Weather Forecasting to Facilitate Winter Road Maintenance | 12/2020 | Completed |
19-S1 | Inventory and Use of Salt Spreading Systems | 01/2021 | Completed |
19-02 | Recruitment and Retention of Highway Maintenance Workers | 08/2021 | Completed |
18-06 | Standard Test Procedures for Ice Melting Capacity of Deicers | 03/2024 | Completed |
16-05 | Weather Event Reconstruction and Analysis Tool | 12/2019 | Completed |
13-05 | Developing Test Bed Software to Qualify Plug and Play Technology | 06/2019 | Completed |
16-03 | Standards and Guidance for Using Mobile Sensor Technology to Assess Winter Road Conditions | 05/2019 | Completed |
18-02 | High Performance Blade Evaluation | 01/2023 | Completed |
15-01 | Synthesis of Material Application Methodologies for Winter Operations | 04/2019 | Completed |
16-02 | AWSSI Enhancements in Support of Winter Road Maintenance | 02/2019 | Completed |
17-S2 | Use of Prewetted Solid Materials for Roadway Anti-icing | 12/2018 | Completed |
17-S3 | Effective Snow and Ice Personnel and Equipment Management for Storm Activation | 10/2018 | Completed |
14-03 | Developing a Training Video and Manual for Best Practices and Techniques in Clearing Different Interchange Configurations and Other Geometric Layouts | 10/2018 | Completed |
16-01 | Utilization of AVL/GPS Technology: Case Studies | 07/2018 | Completed |
16-06 | Training Video for the Implementation of Liquid-Only Plow Routes | 06/2018 | Completed |
17-03 | Aftermarket Cameras in Winter Maintenance Vehicles | 06/2021 | Completed |
16-04 | Emergency Operations Methodology for Extreme Winter Storm Events | 05/2018 | Completed |
17-01 | Integrating Advanced Technologies into Winter Operations Decisions | 12/2020 | Completed |
12-03 | Understanding the Chemical and Mechanical Performance of Snow and Ice Control Agents on Porous or Permeable Pavements | 01/2018 | Completed |
15-02 | Identification and Recommendations for Correction of Equipment Factors Causing Fatigue in Snowplow Operators | 11/2017 | Completed |
14-02 | Quantifying the Impact That New Capital Projects Will Have on Roadway Snow and Ice Control Operations | 11/2017 | Completed |
17-S1 | Calibration Accuracy of Material Application Equipment | 09/2018 | Completed |
14-05 | Snow Removal Performance Metrics | 05/2017 | Completed |
12-04 | Snowplow Operator and Supervisor Training | 04/2017 | Completed |
16-S3 | Maintenance Vehicle Conspicuity | 02/2018 | Completed |
16-S2 | Monitoring Stockpiles of Solid Winter Maintenance Materials | 02/2017 | Completed |
16-S1 | Snowplow Truck Washing Practices | 10/2016 | Completed |
15-03 | North American Study on Contracting Snow and Ice Response | 02/2017 | Completed |
14-04 | Plug-and-Play Initiative: Phase II | 02/2017 | Completed |
14-07 | Identifying Best Practices for Snowplow Route Optimization | 01/2017 | Completed |
14-01 | Synthesis on GPS/AVL Equipment Used for Winter Maintenance | 09/2016 | Completed |
13-02 | Understanding the Effectiveness of Non-Chloride Liquid Agricultural By-Products and Solid Complex Chloride/Mineral Products Used in Snow and Ice Control Operations | 05/2016 | Completed |
14-10 | Roadway Salt Best Management Practices | 11/2015 | Completed |
14-06 | Use Of Equipment Lighting During Snowplow Operations | 09/2015 | Completed |
13-03 | Cost-Benefit of Various Winter Maintenance Strategies | 09/2015 | Completed |
13-01 | Snow and Ice Control Environmental Best Management Practices Manual | 07/2015 | Completed |
13-04 | Best Practices for the Prevention of Corrosion to DOT Equipment: A User’s Manual | 05/2015 | Completed |
14-08 | Weather Severity Mapping Enhancement | 03/2015 | Completed |
15-S1 | Annual Survey of State Winter Maintenance Data | | In Progress |
12-02 | Establishing Effective Salt and Anti-icing Application Rates | 02/2015 | Completed |
12-05 | Comparison of Materials Distribution Systems | 12/2014 | Completed |
12-06 | Plug-and-Play Initiative | 09/2014 | Completed |
11-03 | Development of a Totally Automated Spreading System | 05/2014 | Completed |
11-05 | Environmental Factors Causing Fatigue in Snowplow Operators | 03/2014 | Completed |
10-03 | Understanding the True Costs of Snow and Ice Control | 01/2014 | Completed |
11-02 | Determining the Toxicity of Deicing Materials | 12/2013 | Completed |
11-01 | Cost-Benefit Analysis Toolkit (Phase II) | 06/2013 | Completed |
11-04 | Snow Removal at Extreme Temperatures (Phase I) | 03/2013 | Completed |
10-01 | Developing a Training Video for Field Testing of Deicing Materials | 12/2012 | Completed |
10-02 | Mapping Weather Severity Zones | 09/2012 | Completed |
08-02(WisDot-0092-09-08) | Cost-Benefit Analysis Toolkit | 11/2010 | Completed |
09-02(WisDot-0092-10-18) | Identifying the Parameters for Effective Implementation of Liquid-Only Plow Routes | 09/2010 | Completed |
07-01(WisDOT-0092-08-31) | Development of Standardized Test Procedures for Carbide Insert Snowplow Blade Wear | 09/2010 | Completed |
09-01(WisDOT-0092-10-17) | Correlating Lab Testing and Field Performance for Deicing and Anti-icing Chemicals (Phase I) | 08/2010 | Completed |
08-02(WisDOT-0092-09-09) | Development of Interface Specifications for Mobile Data Platforms on DOT Vehicles | 04/2010 | Completed |
07-01(WisDOT-0092-08-32) | Development of Standardized Test Procedures for Evaluating Deicing Chemicals | 04/2010 | Completed |
08-02(WisDOT-0092-09-21) | Developing and Evaluating Safe Winter Driving Messages | 03/2010 | Completed |
06-01(WisDOT-0092-06-23) | Determining Effectiveness of Deicing Materials and Procedures | 12/2009 | Completed |
05-02(WisDOT-0092-06-21) | Calibration Accuracy of Manual and Ground-Speed-Control Spreaders | 02/2008 | Completed |
05-01 | Synthesis of Best Practices for Eliminating Fogging and Icing on Winter Maintenance Vehicles | 09/2006 | Completed |
11-TSR1 | Snow and Ice Control at Extreme Temperatures | 04/2011 | Completed |
10-TSR1 | Material Spreader Use in Winter Maintenance Operations | 03/2010 | Completed |
09-TSR4 | Levels of Service in Winter Maintenance Operations | 08/2009 | Completed |
09-TSR3 | Training Supervisors in Winter Maintenance Operations | 05/2009 | Completed |
09-TSR2 | Recording Material Usage in Winter Maintenance Operations | 04/2009 | Completed |
09-TSR1 | Post-Storm Meetings: A Survey of State and Local Practice | 01/2009 | Completed |
08-TSR3 | Limitations of the Use of Abrasives in Winter Maintenance Operations | 12/2008 | Completed |
08-TSR2 | Collision Avoidance Systems for Snowplows | 07/2008 | Completed |
08-TSR1 | Virtual Snowplow Training | 03/2008 | Completed |
07-TSR3 | Control of Roosting Birds on Transportation Structures | 04/2007 | Completed |
07-TSR2 | Alternative Energy: Turning up the Heat on Snowy Roads and Bridges | 03/2007 | Completed |
07-TSR1 | Using Friction Measurements to Gauge Winter Maintenance Performance | 03/2007 | Completed |